Plotlay Open the app →

Learn · Glossary

Glossary

The words Plotlay uses, in plain terms, with the lessons that show each one.

3D quality (Standard, High, Ultra)
How the 3D view is drawn on this device. Standard is fastest; High adds soft reflections, shading where surfaces meet and relief in tiles and timber; Ultra adds finer detail. Auto picks one and steps down if the view slows.Also called or searched as: quality, quality tier, graphicsLessons: Walk through your plan in 3D
Accuracy (±)
How far out a GPS position may be, such as ± 4 m. Smaller is better; under 5 m is good for a phone.Also called or searched as: gps accuracy, error, fixLessons: Capture a GPS point on site
Asset register
The list of a project’s assets under Items, each with its tag (EXT-001), type, standard, inspection form and next due date. Placing an asset from the Library adds it to the register.Also called or searched as: register, asset tagsLessons: Map a building’s fire and services assets, Set up asset forms
BCF (BIM Collaboration Format)
Issues passed between BIM programs as a file. Each topic has its words, a camera and the GlobalIds of the elements it is about. In Plotlay a topic is a comment pinned to its element and a saved view.Also called or searched as: .bcf, bcfzip, issues, topics, viewpointsLessons: Pass BCF issues to and from a BIM checker
BIM (building information modelling)
A building drawn as a model with facts attached: a door is a door that knows its width, wall and fire rating, not four lines. Schedules, quantities and checks are read from those facts.Also called or searched as: building information model, model, revit, archicadLessons: Bring in an IFC model and make it editable, Give a door a fire rating and a classification
bSDD
buildingSMART’s online dictionary service, where classification systems such as Uniclass 2015 and property definitions are published. Look up in the BIM data dialog searches it for a word.Also called or searched as: buildingsmart data dictionary, data dictionary, look upLessons: Give a door a fire rating and a classification
Building (and its roof)
A group of rooms within about half a metre of one another. Each building on a site has its own roof type, pitch, eaves, ridge, sheet and colour, and its own elevations.Also called or searched as: buildings, per-building roofLessons: Give each building its own roof
Building type
The kind of building a Library item suits, such as warehouse, hospital, school or airport. The Library’s Any building type filter shows that building’s rooms, equipment, kits and services.Also called or searched as: commercial, building typesLessons: Lay out a commercial building from the Library
Classification (Uniclass, OmniClass, NATSPEC)
A code that says what a thing is in a published system, such as Uniclass 2015 Pr_30_59_24 for doorsets. Clients ask for it in their information requirements. Plotlay bundles no table: codes are typed or looked up on bSDD.Also called or searched as: uniclass, omniclass, natspec, classification code, cobie categoryLessons: Give a door a fire rating and a classification
Clearance zone
A dashed area placed with an item to show the space it needs: a forklift aisle, the space beside a bed, or the clearance to combustibles round a fire. On the plan only, with typical figures for reference.Also called or searched as: clearance, clearances, clearance to combustiblesLessons: Lay out a commercial building from the Library, Add a fireplace or heater
Client view
The simple view a guest gets: the plan, a 3D walk-through, design options, the saved views to tour, quotes to accept, allowed documents and comments, with none of the editing tools.Also called or searched as: shared view, preview what they seeLessons: Open a project shared with you, Show a client the design, Share a tour of saved views, Accept or decline a quote in a shared project
COBie
A spreadsheet of floors, spaces, equipment types and components handed to the people who will run a building. Plotlay writes the COBie 2.4 sheets in Building handover; Category comes from the classification you set.Also called or searched as: cobie.xlsx, handover spreadsheet, asset dataLessons: Give a door a fire rating and a classification
Connected copy
A guest’s own copy of a shared project that stays linked to the original. Changes made in it go back as a proposal, and later changes to the original can be pulled in.Also called or searched as: linked copy, fork, take a copyLessons: Try changes in a connected copy, Review changes sent back to you
Connector (MCP)
The way Claude and other AI agents work in your Plotlay projects as you, through the Model Context Protocol at app.plotlay.io/mcp.Also called or searched as: ai agent, claude, mcpLessons: Connect Claude or another AI agent
Demolition plan (existing and demolition)
The house as it is, with what comes out dashed and walls to be removed hatched. Widening an opening hatches only the extra wall removed; the new opening is noted "New lintel / beam to engineer’s detail" until a lintel is given.Also called or searched as: demo plan, demolition hatch, existing to be removed, lintel noteLessons: Issue a drawing set, Show the house before and after
Design code
A set of planning or building rules for a place, such as a state’s planning code, built into Plotlay as a pack of checks. Choose the codes that apply to each project.Also called or searched as: planning code, code pack, NCC, building codeLessons: Choose the design codes for a project, Run a check and read the results
Design option
One of two or more versions of part of a design, such as two vanities, kept in one project. Drawings show the chosen one; 3D can show another for a look. Clients can pick the one they like.Also called or searched as: option set, alternative, schemeLessons: Compare design options, Comment and pick design options
Dimension style (AS 1100 and others)
How dimensions are drawn. AS 1100 by default: the figure above its line, read from the bottom or the right, ticks, millimetres; outside its piece when too long. Others: ISO 129 arrows, US architectural, US mechanical. Never on a white box.Also called or searched as: dimension convention, AS 1100, dimension text, ticks or arrowsLessons: Issue a drawing set
Drawing set
One numbered PDF of sheets (cover, plans, elevations, sections, schedules) with the same title block on each.Also called or searched as: sheets, plans to lodge, construction drawingsLessons: Issue a drawing set, Make the plans to lodge
Elevation and section
An elevation is a side of the house, or a wall from inside, drawn straight on. A section is a cut through the building along a line you place.Also called or searched as: facade, wall view, cutLessons: Make elevations and sections
Entered by an AI agent (needs review)
Rules an AI agent added are flagged until a person reads and confirms each one, so a made-up limit can’t pass unnoticed.Also called or searched as: needs review, confirm ruleLessons: Import a rule pack and review agent rules
ESM (essential safety measures)
The fire and life safety items a building must keep working (extinguishers, exit signs, hydrants, fire doors) and the register of their inspections, with when each is next due.Also called or searched as: essential safety measures, esm registerLessons: Map a building’s fire and services assets
Estimate
An indicative cost of the project or some rooms, measured from the model and priced line by line, by trade and by room, with a likely range. Not a price: check it with quotes from licensed trades.Also called or searched as: cost estimate, estimatingLessons: Estimate a renovation or new build, Adjust an estimate with your own rates
Find or make (find-or-create)
Asking for an item to a requirement (sizes with a tolerance, drawers, an open shelf): Plotlay measures the candidates, says what differs, and adjusts a copy or builds one rather than passing off a near miss.Also called or searched as: find or make, find_or_create_objectLessons: Have an agent find or make an object, Add your own objects to the Library
Fit-out
The fixed items that go into a room: vanities, toilets, kitchen runs, appliances, lights and joinery. Fit-out is placed against a wall and built in 3D.Also called or searched as: fixtures, fittings, vanity, joineryLessons: Choose finishes and add fit-out to a room, Add a bench run of joinery
GlobalId
The 22-character name an IFC element keeps for good. Programs match elements by it, so a model issued again updates each one in place. Plotlay keeps them in the project and writes the same ones every export.Also called or searched as: guid, ifc guid, global id, element idLessons: Export an IFC model others can open, Pass BCF issues to and from a BIM checker
Guest roles
What a person you invite may do: Can view (look and walk through), Can comment and pick options, or Can edit. Viewers need no account.Also called or searched as: can view, can comment, can edit, permissionsLessons: Invite guests to a project, Open a project shared with you
IDS (Information Delivery Specification)
A client’s requirements of a model as a file a program can check, such as every door has a fire rating. Plotlay reads IDS 1.0 and says Pass or Fail per specification, naming each element that falls short.Also called or searched as: .ids, information requirements, eir, model checkLessons: Check an IFC model: IDS, quantities, design codes, Give a door a fire rating and a classification
IFC
The open file format BIM programs swap. Every thing in it has a class (IfcWall, IfcDoor, IfcSpace for a room), property sets and a GlobalId. Plotlay reads IFC2X3, IFC4 and IFC4X3 and writes IFC4.Also called or searched as: industry foundation classes, .ifc, ifc4, ifc2x3, open bimLessons: Bring in an IFC model and make it editable, Export an IFC model others can open
ISO 19650 (document numbers, status, revision)
The standard for managing information on a BIM project. Day to day it means a document number built from project codes, a status code (S3 For review and comment) and a revision (P01). The project’s own standard sets the codes.Also called or searched as: 19650, status code, suitability, revision code, p01, s3, bep, eir, cdeLessons: ISO 19650 naming: numbers, status and revision codes
Joinery (bench run)
Built-in cabinetry along a wall, such as a kitchen or laundry bench with base cupboards, drawers and handles. Plotlay draws it on plans, elevations and in 3D.Also called or searched as: cabinets, cupboards, kitchen run, drawersLessons: Add a bench run of joinery
Layer
A group of shapes, rooms and items in a project, listed in the Layers tab. A hidden layer is left out of the plan, 3D and documents until you show it again.Also called or searched as: hide, lock, visibilityLessons: Fix common problems, Show the house before and after
Level
A floor of the building, such as ground or upper. Each room, drawing and item sits on one level, and the plan shows one level at a time.Also called or searched as: floor, storey, basement, upper floorLessons: Fix common problems
Library
Furniture, fittings and equipment at real sizes, by category and subcategory: kitchen, bathroom, furniture, lighting, power, heating, stairs, outdoor, site, commercial, vehicles, plants. Search in your own words (GPO, countertop), filter, and star favourites.Also called or searched as: furniture, items, objectsLessons: Choose finishes and add fit-out to a room
My finishes
Tiles, boards, stone, render, paint and fabric you add from a photo, at their real size and laying, for floors, walls, benchtops and furniture. Keep them in the project, your library or your team’s.Also called or searched as: own finish, own tiles, finish from a photoLessons: Use your own tiles and finishes from a photo, Choose a sofa style and its fabric
My objects
Library items of your own: a copy of a Library item with its settings changed, one built from parts whose sizes follow formulas, or a maker’s 3D model brought in.Also called or searched as: own object, object builder, custom itemLessons: Add your own objects to the Library, Have an agent find or make an object
Overhead clearance zone
The band either side of an overhead power or telecom line on the plan, and the see-through zone round its conductors in 3D. Typical figures, reference only: check with the network operator.Also called or searched as: no go zone, overhead clearanceLessons: Draw overhead power and telecom lines
Overlay
A drawing, plan or picture laid over the map or plan, such as a site plan PDF or a DXF. Pin it to line it up with the aerial.Also called or searched as: drawing, base plan, layer imageLessons: Pin a plan or drawing to the map, Bring files into Plotlay
PASS, WARN, FAIL and UNKNOWN
The results of a check. UNKNOWN is not a pass: Plotlay is missing a measurement or a fact to tell, and the note says which.Also called or searched as: compliance result, check resultLessons: Run a check and read the results, Run the compliance check
Phase (existing, proposed, demolish)
Whether something is there now and stays (existing), is new work (proposed) or is coming out (existing, to be removed). Plans, 3D and documents show Current, Proposed or Both from it.Also called or searched as: current, before and after, statusLessons: Show the house before and after, Show options and the before rooms in a room pack
Pin (control point)
A pair of matching points, one on a drawing and one on the map, that places the drawing. Two pins place it; a third shows how well it fits.Also called or searched as: georeference, control point, match pointsLessons: Pin a plan or drawing to the map
Plotlay Scan
The free app for iPhone, iPad (App Store) and Android (Google Play) that measures rooms, with LiDAR or by floor corners, and sends them to a Plotlay project at true size.Also called or searched as: lidar, iphone app, android app, room scanLessons: Connect Plotlay Scan to a project, Scan rooms with a phone or tablet
Price book
The typical prices an estimate starts from, per line (a tiled square metre, a toilet installed), with labour hours. Your own rates and imported supplier price lists take their place.Also called or searched as: price list, rates, my rates, rate setLessons: Adjust an estimate with your own rates
Project import
Bringing buildings, levels or layers from another project, an example or a project file into this one, as one change. Import history takes an import out again.Also called or searched as: import from a project, import history, merge projectsLessons: Bring in buildings or layers from another project
Property set (Pset)
A named group of facts on an IFC element. Pset_DoorCommon holds a door’s FireRating and IsExternal. buildingSMART publishes the standard sets; a project can add its own. Qto sets hold measured quantities.Also called or searched as: pset, properties, fire rating, qto, base quantitiesLessons: Give a door a fire rating and a classification, Check an IFC model: IDS, quantities, design codes
Proposal
Changes sent back from a connected copy. The owner sees each change side by side with the project and accepts or rejects it.Also called or searched as: suggested changes, change requestLessons: Review changes sent back to you
Quote and revision
An estimate turned into a numbered price for a client, on your letterhead, with terms and a payment schedule. A change after it is sent is a new revision (rev B), so the sent copy stays as it was.Also called or searched as: quotation, revision, rev bLessons: Send a quote, Accept or decline a quote in a shared project
Reference only
Checks are simplified from published sources and may be out of date. Verify each rule with the current code and your council or certifier before relying on it; they decide.Also called or searched as: disclaimer, not certificationLessons: Run a check and read the results
Restore point
A saved copy of the whole project on this device, kept after you close Plotlay. Undo covers this session; a restore point covers the days after.Also called or searched as: backup, snapshot, versionLessons: Undo, redo and go back in History
Room pack
A PDF about chosen rooms: each plan at scale, every wall, views inside and the finish and fit-out schedules. Can show before and after side by side.Also called or searched as: room sheets, trade briefLessons: Make a room pack, Show options and the before rooms in a room pack
Rule pack
A group of checks with their limits, sources and versions: a built-in design code, your own template, or one imported from a file. A project keeps the version it was checked against.Also called or searched as: pack, code pack, rules fileLessons: Import a rule pack and review agent rules, Your standards in a spreadsheet: templates and export, Make your own template with tolerances
Saved document (preset)
A document’s settings kept by name in the project, such as a room pack of the wet areas. Make again produces it from the project as it is now.Also called or searched as: preset, your documents, make again, templateLessons: Save document settings and make them again
Saved view
A place to look from, kept with the project: the plan, a 3D camera or a spot to stand in walk mode, with the design options (shown in 3D only), layers, phase and level. Saved views play as a tour and can be where a share starts.Also called or searched as: bookmark, saved views, viewpoint, tourLessons: Save views and play them as a tour, Share a tour of saved views
Schedule
A table drawn from the plan: rooms and finishes, doors, windows, plants or materials. It updates as the plan changes and downloads as CSV.Also called or searched as: door schedule, window schedule, finish scheduleLessons: Read and download the schedules
Starting view
Where a guest or link starts (the whole project, some rooms, the 3D model, an option set or a document), what they can see and change, and a note for them.Also called or searched as: landing, start view, where they startLessons: Set where guests start and what they see, Share a project with a link
Supplier catalogue
A supplier’s range brought in from their file (an Excel or CSV price list, BMEcat, a Google Merchant feed, IFC objects) with its product codes, prices and photos, to place its products, use its finishes and schedule them by code.Also called or searched as: catalogue, catalog, price list, BMEcat, product feedLessons: Bring in a supplier’s catalogue
Take-off (quantities)
The quantities measured from the model for an estimate: wall areas net of doors and windows, tiles by height band, floors, ceilings, fit-out items and site works.Also called or searched as: quantity take-off, takeoff, quantitiesLessons: Estimate a renovation or new build
Template (your own rules)
A rule pack you make yourself, such as an estate’s design guidelines or a builder’s standards, with your own limits and tolerances. Save it to your library to use again.Also called or searched as: estate guidelines, covenant, builder rules, custom rulesLessons: Make your own template with tolerances, Your standards in a spreadsheet: templates and export
Title block
The box on every sheet with the project, address, client, job number, drawn and checked by, and the revision. Filled in once per project.Also called or searched as: sheet details, revision, job numberLessons: Issue a drawing set
Tolerance
How far a value may miss a rule’s limit and still show WARN rather than FAIL: a 6000 mm setback with a 200 mm tolerance accepts 5800 mm as WARN. A warn band does the reverse for a pass close to the limit.Also called or searched as: warn band, margin, leewayLessons: Make your own template with tolerances
Work list
A run through an asset register on site, nearest first, recording each asset as found, not found or skipped.Also called or searched as: audit run, register walkLessons: Work through an asset register on site
Workspace
Site, Building, Capture or Documents in the top bar. A workspace changes which tools come first; it never hides anything in the project.Also called or searched as: site, building, capture, documentsLessons: Switch studios and workspaces