Plotlay Open the app →

Learn · Designers and builders · Lesson 20 of 58

ISO 19650 naming: numbers, status and revision codes

You willTurn on document numbers, status codes and revisions so every drawing and the IFC file are named the way the project standard asks.
Time4 min
Why it mattersA BIM execution plan sets how files are named and coded. Files named another way are sent back before anyone reads them.

Try it in Plotlay → Opens an example project with this lesson beside it. Nothing to install.

Steps

  1. Press Ctrl or Cmd + K and choose Naming and status (ISO 19650). Tick Name and code documents this way.
  2. Type the Project code and your Originator code from the project standard, and pick your Role. File names as they will come out shows a sheet, the drawing set and the IFC model with their numbers.
  3. Under The next issue, pick the Status (for example S3 For review and comment), check the Revision (Next revision steps it) and type the Purpose of issue. Choose Done.
  4. Make a drawing set or export the IFC as usual. Each file takes its document number as its name; sheets show the number, status and revision in the title block.
  5. Open Document register… from the same dialog for every document with its number, status, revision and date, as a PDF, CSV or Excel to send with the issue.

Tips

  • A document already made keeps what it was issued with. Status and revision… on its entry in Documents produced changes one document.
  • An older revision is marked superseded in Documents produced once a newer one is made.
  • Your AI agent does the same through the connector: set_document_naming, set_document_status and get_document_register.

Common mistakes

  • Leaving the originator as XXX: the dialog lists what is still not set. Get the codes from the BEP or the client’s information requirements.
  • A status and a revision that disagree, such as a shared status on a work in progress revision: the dialog says so. Use Next revision.
  • Expecting the codes to be chosen for you: Plotlay applies them. The project’s own standard decides which codes are used.
Check yourself

The drawings are going to the client for comment. What do you change before making the set?

Words in this lesson

ISO 19650 (document numbers, status, revision)
The standard for managing information on a BIM project. Day to day it means a document number built from project codes, a status code (S3 For review and comment) and a revision (P01). The project’s own standard sets the codes.
Drawing set
One numbered PDF of sheets (cover, plans, elevations, sections, schedules) with the same title block on each.
Title block
The box on every sheet with the project, address, client, job number, drawn and checked by, and the revision. Filled in once per project.
Connector (MCP)
The way Claude and other AI agents work in your Plotlay projects as you, through the Model Context Protocol at app.plotlay.io/mcp.

Related lessons

Steps checked in the app on 15 November 2026.