Design codes · Australia
Livable Housing Design, Class 1a houses (INDICATIVE)
Covers the Livable Housing Design Standard for new Class 1a houses: entrance and internal door clear openings, corridor widths and separate WC widths (measured), plus hand checks for the step-free path, ramps, parking space, thresholds, entrance landing and weatherproofing, entry level toilet and circulation space, step-free shower and wall reinforcement. Applies in the ACT, NT, QLD, SA, TAS and VIC from each one's adoption date. Does not cover NSW or WA (not adopted), Class 2 apartments, alterations and additions, or state exemptions in detail.
Reference only. Rules are simplified from published sources and may be out of date or incomplete. Verify with the current code and your council, certifier or relevant authority before relying on them.
The instrument
ABCB Standard for Livable Housing Design, called up by NCC Volume Two H8D2 (NCC 2022 and NCC 2025)
Livable Housing Design Standard 2025 (version 1.4, released 1 May 2026, for NCC 2025) and 2022 (version 1.3, 15 November 2023, for NCC 2022): the figures are the same. Seen on ncc.abcb.gov.au 2026-10-14. Adoption for new Class 1a houses: QLD from 1 October 2023 (QDC MP 4.5); NT from 1 October 2023 (building permit applications); ACT from 15 January 2024; VIC from 1 May 2024; SA from 1 October 2024; TAS in stages (entrance door, shower and wall reinforcement from 1 October 2024; internal doors, corridors and toilet space from 1 October 2025; the rest from 1 October 2026). Not applied in NSW (Part H8 left blank) or WA (Building Regulations 2012 r 15C(11) deletes Part H8 from the 2022 and 2025 editions). Source: ABCB Livable Housing Design Standard 2025 (v1.4).
What it checks
Each rule names its clause, linked to the published text. Plotlay measures the drawing (rooms, walls, openings, the boundary and the site), uses the facts you enter about the site, and marks each rule pass, fail or check by hand.
| Rule | Clause |
|---|---|
| Entrance door clear opening at least 820 mm | LHD Standard cl 2.1, Figure 2.1; NCC Vol Two H8D2 |
| Internal door clear opening at least 820 mm | LHD Standard cl 3.1 |
| Corridor clear width at least 1000 mm | LHD Standard cl 3.3 |
| Step-free access path to the entrance | LHD Standard cl 1.1(1) to (3); NCC Vol Two H8D2(2) to (4) |
| Ramps and step ramp on the access path | LHD Standard cl 1.1(4), 1.1(5) |
| Parking space on the access path, 3200 mm by 5400 mm | LHD Standard cl 1.2 |
| Entrance threshold level or nearly level | LHD Standard cl 2.2; SA H8D2(5) |
| Level landing 1200 mm by 1200 mm outside the entrance | LHD Standard cl 2.3 |
| Weatherproofing at a step-free entrance | LHD Standard cl 2.4 |
| Internal door thresholds level or nearly level | LHD Standard cl 3.2 |
| A toilet on the ground or entry level | LHD Standard cl 4.1; SA H8D2(6); QLD MP 4.5 |
| Separate WC at least 900 mm wide | LHD Standard cl 4.2(a) |
| Space in front of the entry level toilet: 1200 mm by 900 mm | LHD Standard cl 4.2(b) to (d), Figure 4.2 |
| One hobless, step-free shower | LHD Standard cl 5.1, 5.2; SA H8D2(7) |
| Wall reinforcement for future grabrails | LHD Standard cl 6.1, 6.2, Figures 6.2a to 6.2g |