Learn · Designers and builders · Lesson 25 of 58
Build-ups: what walls, floors and roofs are made of
You willEach wall, floor, ceiling and roof with its layers, drawn layer by layer at 1:50, listed in a schedule and carried into IFC.
Time5 min
Why it mattersA builder prices and builds from the layers, and a 1:50 plan is expected to show them.
Try it in Plotlay → Opens an example project with this lesson beside it. Nothing to install.
Steps
- Select a room and choose Build-ups… under Walls, floor and ceiling.
- Pick a build-up for Every wall, or open Wall by wall to give each wall its own. A starting build-up is copied into the project the first time you use it.
- Tick Make the wall as thick as the build-up if the wall should take the build-up’s thickness.
- Pick the Floor, Ceiling and Roof build-ups the same way.
- Click a build-up under This project’s build-ups to change its layers: name, what each does, its thickness, and the R-value its maker gives.
- Export a plan at 1:50 or larger to see each layer drawn. At 1:100 the wall stays an outline.
- Choose Add › Detail on the Building strip and click two corners round a junction. Tick A701 Details in the drawing set to draw it again at 1:10 or 1:5.
Tips
- Walls list their layers from the outside face in; floors and roofs from the top down.
- Tick wraps on a lining to return it into door and window reveals.
- Sections at 1:50 draw the floor, ceiling and roof layers too, hatched by material. Plans and sections at 1:50 carry a Materials key for the hatches they show. Set the scale in Elevations.
- With Detail picked, choose a component under Draw (a flashing, a damp-proof course, a lintel, a fixing) and click to place it.
- The build-up schedule joins the other schedules, and IFC carries each build-up as a material layer set.
- An agent uses list_buildups, save_buildup, set_buildup, delete_buildup and add_detail.
Common mistakes
- Reading the R-value as a rated figure. It is the sum of the numbers you typed, with no air films or thermal bridging: reference only.
- Expecting layers on a 1:100 plan. They are drawn at 1:50 and larger.
Words in this lesson
- Demolition plan (existing and demolition)
- The house as it is, with what comes out dashed and walls to be removed hatched. Widening an opening hatches only the extra wall removed; the new opening is noted "New lintel / beam to engineer’s detail" until a lintel is given.
- Layer
- A group of shapes, rooms and items in a project, listed in the Layers tab. A hidden layer is left out of the plan, 3D and documents until you show it again.
- Drawing set
- One numbered PDF of sheets (cover, plans, elevations, sections, schedules) with the same title block on each.
- Schedule
- A table drawn from the plan: rooms and finishes, doors, windows, plants or materials. It updates as the plan changes and downloads as CSV.
Related lessons
Draw walls, then add doors and windowsDraw walls of a set thickness to size, then put doors and windows in them and set their type.4 minStructure: members, lintels and the structural planColumns, beams, lintels, joists, footings and slabs in one member schedule with marks, on a structural plan sheet, each for an engineer to confirm.5 minIssue a drawing setMake one numbered PDF of plans, elevations, 3D views and schedules with your title block.4 min
Steps checked in the app on 16 November 2026.