Learn · Data and analysis · Lesson 8 of 35
Send drawings, rooms and trips to Data
You willA drawing’s traced shapes, the GPS points taken over it, shapes on the plan, the rooms or the daily trips handed to Data Studio in one click.
Time3 min
Why it mattersThe drawing, the rooms and the trips are already in the project; reporting on them should not mean drawing them twice.
Try it in Plotlay → Opens an example project with this lesson beside it. Nothing to install.
Steps
- A drawing on the map: click it, and in its properties under In Data Studio choose Its shapes as data for the rooms or lots traced off it (trace them first with the wand or Analyse drawing…). They become keyed shapes in a data layer named for the drawing.
- On the same drawing, Points on it as data makes a layer of only the assets standing on it, kept up to date: the points captured on site over a plan, coloured by condition and charted.
- In Site, pick shapes on the plan (Shift-click for more), then More › Shapes to Data in the strip: a new data layer or one you have. The shapes on the plan stay as they are.
- In Building, More › Rooms as data makes a layer of the rooms kept up to date as rooms are drawn. Its note in Data has Open in Design to go back to Building.
- In Walk times, Walk times as data puts each daily trip on the data map as a line, with its minutes a day and hours a year.
Tips
- Each lands in Data Studio on the layer’s Data tab, ready to link a spreadsheet to the keys.
- The AI connector does the same with shapes_to_data and link_project_data; list_project_data says what each studio can hand across.
Common mistakes
- Looking for Its shapes as data on a drawing not yet placed on the map: place it first (three points), then trace.
Words in this lesson
- Layer
- A group of shapes, rooms and items in a project, listed in the Layers tab. A hidden layer is left out of the plan, 3D and documents until you show it again.
- Connector (MCP)
- The way Claude and other AI agents work in your Plotlay projects as you, through the Model Context Protocol at app.plotlay.io/mcp.
Related lessons
Keep the asset register, rooms or walk times on the mapA data layer that follows the project: each audit, each room drawn and each change to a daily trip shows on it straight away.2 minMake a data layer from shapes, lots, rooms or pointsA layer of shapes for buildings, bays, zones, lots or sensors, each with a key a spreadsheet can be linked to.4 minLink a spreadsheet to the shapesA CSV or Excel table joined to a layer by key, with a report of what matched, from a file, a paste or an open data address.3 min
Steps checked in the app on 13 November 2026.