Plotlay Open the app →

Learn · Data and analysis · Lesson 7 of 35

Keep the asset register, rooms or walk times on the map

You willA data layer that follows the project: each audit, each room drawn and each change to a daily trip shows on it straight away.
Time2 min
Why it mattersA copy goes stale after the next audit; a layer that follows the register is always the map of what was found.

Try it in Plotlay → Opens an example project with this lesson beside it. Nothing to install.

Steps

  1. In Data, choose + Add data, then From this project. (Or, on the Data layers panel’s start, a button under From this project, kept up to date.)
  2. Choose what it follows: Asset register (each asset with a place on the map, keyed by its tag, with its columns and last audit), Rooms (each room’s outline, with its building, level and floor) or Walk times (each daily trip as a line, with its minutes a day and hours a year).
  3. For the register, choose Each asset as a point, a circle or a square, one group, or Only those standing on a drawing, for the points taken on site over a plan. Choose Make the layer.
  4. Colour it on the Style tab (by condition or audit_status), chart it in Analysis, or put a map picture of it on a board.
  5. Record an inspection in the field: the layer changes with it. Undo takes both back. Under the layer’s shapes, Bring up to date now and Stop following (it stays as it is, a copy); a rooms layer has Open in Design.

Tips

  • People you share the project with see the layer change as soon as the change reaches them.
  • The AI connector makes the same with link_project_data, and keeps it in step after its own changes.
  • Assets without a place on the map are left out, and the panel says how many.

Common mistakes

  • Editing the layer’s shapes by hand: they go back to where the asset or room is. Change the asset or the room instead, or choose Stop following first.
Check yourself

An asset is moved on the plan. What happens to a layer that follows the register?

Words in this lesson

Layer
A group of shapes, rooms and items in a project, listed in the Layers tab. A hidden layer is left out of the plan, 3D and documents until you show it again.
Connector (MCP)
The way Claude and other AI agents work in your Plotlay projects as you, through the Model Context Protocol at app.plotlay.io/mcp.
Asset register
The list of a project’s assets under Items, each with its tag (EXT-001), type, standard, inspection form and next due date. Placing an asset from the Library adds it to the register.

Related lessons

Steps checked in the app on 13 November 2026.