Plotlay Open the app →

Learn · Data and analysis · Lesson 2 of 35

Link a spreadsheet to the shapes

You willA CSV or Excel table joined to a layer by key, with a report of what matched, from a file, a paste or an open data address.
Time3 min
Why it mattersThe numbers live in a spreadsheet and the shapes on the map; linking them by key is what makes the map mean something.

Try it in Plotlay → Opens an example project with this lesson beside it. Nothing to install.

Steps

  1. In Data, click the layer’s name in the Map key, then the Data tab and Linked data.
  2. Choose Link a CSV or Excel file, or Link from an address for an open data portal’s CSV or JSON export. Try sample data makes up two weeks of numbers to practise on.
  3. Check the preview: the Key column that holds the shapes’ keys, and the Shape of the table: One row per key, or Key, date, value for a time series with its Time column. Choose Link.
  4. Read the report under the dataset: how many keys matched, the ones that did not, and close names it suggests. Keys match loosely: B01, b1 and B-01 are one key.
  5. From anywhere in Plotlay: drop the file on the map, or paste rows copied from Excel. Plotlay asks where it goes (A table in Analysis, Data on a data layer, The asset register...); choose one and Bring it in.
  6. Link a live source (Team plan, in a project synced to your account): on the same tab, under Or read it from somewhere that keeps it up to date, choose a web address, a bucket, an ArcGIS layer or SharePoint or OneDrive, pick the file, then set Keep it up to date.

Tips

  • No shapes yet? Link the table anyway: its rows become a list to place one by one on the Shapes tab.
  • A live source refreshes at most hourly, with files up to 10 MB. A read that drops a column or matches far fewer keys is held for review, and the map keeps its data. IT teams: getplotlay.com/guides/connections-for-it.
  • A table of latitudes and longitudes needs no keys: each row is placed in the shape it falls in, with a few metres to spare for sensors on a wall.
  • Next year’s figures: the dataset’s Replace data keeps its colours, formulas and charts. A linked address has Refresh.
  • + Add data, then Paste a table, takes rows from Excel as a table for Analysis.

Common mistakes

  • Codes with their leading zeros dropped by Excel (0123 saved as 123): keep the column as text in Excel, or let the close-name suggestions match them.
  • A file with a title row above the headings: delete it first, since the first row is read as the headings.
Check yourself

Your table has one row per school per year. Which shape of table do you choose?

Words in this lesson

Layer
A group of shapes, rooms and items in a project, listed in the Layers tab. A hidden layer is left out of the plan, 3D and documents until you show it again.
Asset register
The list of a project’s assets under Items, each with its tag (EXT-001), type, standard, inspection form and next due date. Placing an asset from the Library adds it to the register.

Related lessons

Steps checked in the app on 12 November 2026.