Plotlay Open the app →

Learn · Analysis · Lesson 3 of 7

Summarise a data layer over time

You willRead a coloured data layer’s numbers beside the map, and watch them change as the time slider moves.
Time3 min
Why it mattersThe map shows where; the strip shows how many and how much. Side by side, they tell the whole story.

Try it in Plotlay → Opens an example project with this lesson beside it. Nothing to install.

Steps

  1. Open a project with a coloured data layer, then choose Analysis (Alt+5).
  2. Choose the layer under Data layers. Its table has a row per key with its name, area, fields and value, the number the map is coloured by.
  3. Move the time slider on the map, or press play. The value column and the strip follow it.
  4. Hover over a row: its shape lights up on the map.
  5. Choose a linked dataset under the layer for every row as it was read, each one knowing its shape.

Tips

  • The strip says which year or hour it shows, and that it follows the time slider.
  • Each row starts with its colour on the map, so the table reads like the legend.

Common mistakes

  • Expecting the value column on a layer that isn’t coloured yet: colour it first in Data layers › Colour.
Check yourself

You move the time slider from 2015 to 2025. What changes in Analysis?

Words in this lesson

Layer
A group of things in a project, listed in the Layers tab. A hidden layer is left out of the plan, 3D and documents until you show it again.

Related lessons

Steps checked in the app on 8 November 2026.