Learn · Data and analysis · Lesson 18 of 35
A road closed for roadworks: the detours
You willA road closed between certain hours, the trips that used it, where they go instead, and the extra minutes by suburb.
Time5 min
Why it mattersBefore a closure is approved, see which roads the detours land on and who is delayed, without claiming a traffic forecast.
Try it in Plotlay → Opens an example project with this lesson beside it. Nothing to install.
Steps
- In Data, click the layer of destinations (a hospital, the city centre, a school) in the Map key, then the Analyse tab and What if a road closed?
- Choose the places people drive from after From, such as suburbs or mesh blocks, and a Weight such as residents.
- Draw the closed road: click along it and double-click to finish. In the dialog give it a name, its hours and days; tick Closed right through for a weekend closure that runs from Friday evening to Monday morning.
- Optionally choose a layer of traffic counts after Counts and its vehicles a day column. Leave Keep to main roads ticked so the detours follow main roads as a signed detour does.
- Work out the detours. The places get a detour_min column, the closed road comes in red with its name, and the detours as lines, wider the more trips. With counts, each detour road is coloured by how much more it would carry than it does today: up to a quarter more, half as much again, double, or more than double.
- Through the week starts with the road open and the trips on it, then closes it: the stretches turn red and say CLOSED, the detours grow in with their road names, and a counter says how many vehicles need another way. Without more data it gives the count for an average day of the year and says so; with day factors or hourly profiles kept with the project it gives this hour’s estimate and the total so far, labelled as estimates. Map video records it.
Tips
- Only the part of a trip that changes is drawn: orange where the rerouted trips go, grey for the roads they no longer use.
- With traffic counts, each detour road shows the vehicles a day moved onto it beside the count it carries now.
- Published counts such as annual average daily traffic are an average day of the year, weekdays and weekends together. In Indicative delay, The day the counts describe takes a factor for each day (a Saturday at 0.88 of the average day, say) or a CSV of factors and hourly profiles per road, and Keep for this project uses it in Through the week too. Every figure then names the basis it came from.
- Closures are kept with the project: untick one to leave it out of a run, or Name this run to keep two runs side by side.
- Indicative delay (with counts) puts a volume-delay curve on each detour road: its volume over what it can carry and the added minutes at each hour, always as a range from a low and a high capacity. Every assumption is listed and can be changed: the curve, the capacity per lane, each road’s lanes, the hourly profile. It is a design aid for seeing where a closure presses hardest. It is not a traffic model: signals, queues and drivers changing route are left out.
Common mistakes
- Reading the extra minutes as the delay on the day: they are the detour on empty roads. No traffic is simulated, so queues on the detour roads are not in the answer.
- Putting a daily count beside a time on the clock: a count of 50,000 a day is about 2,500 to 4,000 in a daytime hour and a few hundred overnight, and usually less at the weekend. Give day factors or a profile to see the hour, or quote the daily figure as an average day.
- Closing one direction only: roads count both ways here, so a closure applies to both.
- Quoting one number from the indicative delay: it is a range that moves with the assumptions (try the other curve, or a capacity 10% lower). Check that the open network reads as plausible before reading the delays.
Words in this lesson
- Layer
- A group of shapes, rooms and items in a project, listed in the Layers tab. A hidden layer is left out of the plan, 3D and documents until you show it again.
- Estimate
- An indicative cost of the project or some rooms, measured from the model and priced line by line, by trade and by room, with a likely range. Not a price: check it with quotes from licensed trades.
- Quote and revision
- An estimate turned into a numbered price for a client, on your letterhead, with terms and a payment schedule. A change after it is sent is a new revision (rev B), so the sent copy stays as it was.
Related lessons
Drive times, and “if these closed”Minutes by road from every place to the nearest hospital or depot, travel-time bands, and the same run with some left out.4 minHow far by public transport, and a planned lineTravel-time bands by walking and public transport from a place over a morning of departures, the people reached, and a planned line.5 min
Steps checked in the app on 15 November 2026.