Showcase · Walk times · Facilities and operations

One bench moved, 170 hours a year back

A made-up picking warehouse, 20 by 25 m, laid out in Plotlay with its everyday trips: three pickers walking pick runs from the packing bench, a packer wheeling cartons to the dispatch pallets, goods in on a pallet jack. Plotlay walked every trip round the shelving, then tried the packing bench beside the roller door as a design option. The same 224 trips a day take 170.1 fewer hours a year, and 591.5 km less walking and wheeling.

Walk times in Plotlay: the routes the app draws over the plan, thicker the more trips they carry. As it is, then Moved, from the same camera. Each frame is a picture from the app.
170.1 ha year saved by moving one bench
591.5 kma year less walking and wheeling
$7,656a year at a sample $45 an hour
121.3 to 80.6minutes of trips a day

The floor and its trips

The warehouse came from Plotlay’s Quick start: a 20 by 25 m shed with a roller door, 61 bays of picking shelves in runs with 1.2 m aisles and a cross aisle, and 7 bays of pallet racking along the back wall. The packing bench stands at the back of the right-hand wall, where it was put when the shelving went in. The dispatch pallets wait inside the roller door.

The trips are the ones a small online shop’s floor makes every working day (made-up figures, 250 days a year):

TripOne way, as it isMoved
Pick run: front left28.9 m6.7 m
Pick run: middle left15.3 m10.9 m
Pick run: back middle8.7 m20.3 m
Pick run: front right14.1 m11.0 m
Pick run: middle right5.2 m19.8 m
Cartons to dispatch29.4 m4.2 m
Goods in to the racking26.5 m26.5 m
Restock: racking to middle left12.4 m12.4 m

Five pick runs, each by three pickers on foot, 10 to 14 times a day; cartons to dispatch on a trolley 30 times a day; goods in on a pallet jack 8 times; restocking on a trolley 6 times. Every trip there and back. 224 trips a day in all.

The made-up warehouse in Plotlay 3D with the roof off, from above the back corner: rows of shelving, the roller door in the far corner, the packing bench against the right-hand wall, seen on the left.
In 3D, as it is: the packing bench on the right-hand wall (left of the picture), far from the roller door.
The same warehouse in 3D from the same camera with the packing bench moved to the front wall beside the roller door.
Moved, from the same camera: the bench on the front wall, beside the roller door.

As it is, then moved

Plotlay routes every trip the shortest way round what stands on the floor, at average speeds for each way of moving: on foot, pushing a trolley, a pallet jack. As it is, the trips take 121.3 minutes a day, 506.1 hours and 1,968.9 km a year.

The warehouse plan in Plotlay with the trips drawn: blue pick runs from the packing bench at the back right across the floor, a green trolley route from the bench to the dispatch pallets by the roller door, an orange pallet jack route to the racking.
As it is: the cartons go the length of the shed to dispatch.
The same plan with the packing bench on the front wall: the pick runs fan out from the front, the trolley route to dispatch is a few metres.
Moved: the routes fan out from the front.

With the bench beside the roller door the trips take 80.6 minutes a day, 336 hours and 1,377.4 km a year: 170.1 hours and $7,656 a year less at a sample rate of $45 an hour. Most of it is the cartons: 29.4 m to dispatch becomes 4.2 m, 120.5 hours a year on its own.

Not every trip gets shorter. The pick runs to the back of the floor and the right-hand side were short from the old bench and are longer now: 8.7 m to 20.3 m, and 5.2 m to 19.8 m. The total still drops, because the busiest runs are at the front. Change the trips to your own counts and the answer changes with them.

The lean wastes

Walk times sorts every trip into two of lean’s wastes: motion (people moving) and transport (moving goods). As it is, motion is 320.6 hours a year and transport 185.5. Moved, 271 and 65. Before the move it also said that 4 of the 8 trips make 81.5% of the time, and which ones to start with.

It flags where people on foot share the way with vehicles. As it is, the pick runs come within a metre of the pallet jack’s way for 15.9 m and cross it in 2 places. The move makes that a little worse: 16.2 m and 3 crossings, because the bench now sits on the pallet jack’s way in from the roller door. A marked walkway or a different spot for goods in would be the next thing to try. Safe Work Australia’s Traffic management: guide for warehousing says keeping people on foot and forklifts apart is the most effective way to prevent forklift injuries.

Plotlay spaghetti diagram on an A3 sheet: the warehouse plan with every trip as a numbered coloured line, a legend, the list of trips with metres and minutes a day, the lean wastes and the title block.
The spaghetti diagram Plotlay makes from the same trips (moved), as exported: numbered trips, the busiest ways, where people and the pallet jack meet, the lean wastes. A3 PDF above.

How it was made in Plotlay

  1. Quick start, then Warehouse, Picking shelves, 20 by 25 m, with packing benches and pallet racking along the back. One bench was moved to the back of the right-hand wall to stand for the layout as it grew.
  2. Walk times (Ctrl+K): each trip from a place to a place, picked from the list or tapped on the plan, with how it goes (on foot, trolley, pallet jack), how many times a day and by how many people. Year, cost and speeds: 250 days and a sample $45 an hour.
  3. Show on the plan draws the routes, thicker the more trips they carry, with the shared stretches in yellow and the crossings marked.
  4. The bench tried in a new place as a design option (As it is, Moved): the trips go to whichever option is shown, and Before and after compares them with the same trips and speeds.
  5. Spaghetti diagram (PDF) for the sheet. An AI agent can do the same through Plotlay’s connector: set_walk_routine, walk_times, try_walk_suggestion, walk_compare, walk_wastes and export_drawing.

Read it carefully

Sources and licences

Everything on this page is made up and was made in Plotlay: the warehouse from Quick start, the trips in Walk times, the pictures, the animation and the spaghetti diagram. The speeds are Plotlay’s defaults (on foot 1.2 m/s, a trolley 0.9 m/s, a pallet jack 1.0 m/s). The traffic note quotes Safe Work Australia’s Traffic management: guide for warehousing. There is no data to download beyond the diagrams: open the example to see every trip and change it.