Showcase · Flow along lines · DIT traffic counts, OpenStreetMap and Adelaide Metro
What does a traffic count look like when it moves?
The Department for Infrastructure and Transport publishes an average daily count for every state road section it counts: 1,363 sections and 1,266 km in metropolitan Adelaide. A count is a number in a table. Here each section carries as many moving dots as its count puts on the road at an average moment, travelling at the section’s speed limit, both ways and keeping left, with the trains and trams of a weekday timetable in green.
That is about 15,000 vehicles on these roads at an average moment, drawn as 30,302 dots (two a vehicle). A road with a high count and a low limit is the densest: South Road’s busiest section, 67,600 vehicles a day at 40 km/h through the roadworks, averages about 70 vehicles a kilometre, against about 42 on the North South Motorway, the busiest count at 91,600 a day, at 90 km/h.
How many dots, and how fast
A road that carries 24,000 vehicles a day carries 1,000 an hour on average. At 60 km/h each takes a minute to cover a kilometre, so at an average moment about 17 of them are on each kilometre: the count over 24 hours, times the length, over the speed. Plotlay works that out for every section and puts two dots on the road for each vehicle, spread along it, half going each way. The dots move at the section’s speed limit, 60 times faster than real.


The busiest roads
Each road’s busiest counted section: its vehicles a day, its speed limit in km/h, and the vehicles on each kilometre of it at an average moment (per km), which is what sets how close the dots are.
| Road | A day | km/h | Per km |
|---|---|---|---|
| North South Motorwaycounted 2025 | 91,600 | 90 | 42.4 |
| Southern Expresswaycounted 2025 | 77,800 | 100 | 32.4 |
| Northern Connectorcounted 2024 | 76,600 | 110 | 29.0 |
| Port Roadcounted 2022 | 74,400 | 60 | 51.7 |
| South Roadcounted 2025 | 67,600 | 40 | 70.4 |
| Main North Roadcounted 2024 | 63,700 | 80 | 33.2 |
| Main South Roadcounted 2022 | 58,500 | 80 | 30.5 |
| South Eastern Freewaycounted 2025 | 55,800 | 100 | 23.2 |
| Park Roadcounted 2024 | 55,300 | 60 | 38.4 |
| West Terracecounted 2022 | 54,900 | 60 | 38.1 |
Vehicles a day: DIT’s Traffic Volume Estimates, both directions, an average day of the year. Speed limit: the most common OpenStreetMap maxspeed along the section (13 November 2026), which includes temporary roadworks limits such as South Road’s.

The trains and trams
The green lines are every train and tram shape in Adelaide Metro’s timetable with the trips that run on it on Wednesday 25 November 2026, 1,101 in all, at each shape’s average scheduled speed (its length over the median trip time, stops included). The busiest: GLNELG (tram, 244 trips), BTANIC (tram, 182 trips), SEAFRD (train, 133 trips), BEL (train, 88 trips), OUTHA (train, 80 trips), GAWC (train, 79 trips). Twenty dots stand for one train or tram, so a line reads at the same weight as a road. They are the timetable spread evenly over the day, not positions of real vehicles.
How it was made in Plotlay
- A map project with the DIT sections as a data layer of lines (each with its count, count year and speed limit) and the rail shapes as a second.
- Flow along lines on the Style tab: How many from vehicles_day, the count read as a day, one dot for every 0.5; Speed from speed_kmh; Both ways, keep left. The rail layer the same from trips_day, one way, counting trains and trams.
- Ink streets, the dark base map with grey buildings and blue-grey roads, one click from the same panel.
- Map video under it: Record with a camera path (the presets are a slow drift, an orbit, a push in and a fly-over; this one is keyframes kept with the flow), buildings raised when the view tilts. The key, the caveat and every credit are on each frame.

The live map draws every dot in one WebGL call: the example’s 30,840 dots run at the screen’s full frame rate on a laptop, and stop while the tab is hidden. An AI agent can do the same through Plotlay’s connector with flow_along_lines, and play GPS or timetable trips with fading tails with add_trips. More about Data maps
Python
The road sections with their counts and speed limits, the rail lines with their trips, and a narrated Jupyter notebook that works out the vehicles on each road at an average moment and draws the network and one moment of dots, in the plotlay-adelaide-in-motion repository on GitHub. The timetable is not copied there: it is Adelaide Metro’s to publish, and the repository has a script that downloads it.
Download the notebook (with its outputs) and the data.
For Power BI: data/road_sections.csv opens in Power BI Desktop with Get data, Text/CSV. Each row is a road section with its count, speed limit, the vehicles on it at an average moment and on each kilometre, and the latitude and longitude of a point near its middle for a map visual.
Read it carefully
- An average day, spread evenly. The dots show each road’s count shared evenly over 24 hours. There is no peak hour, no night, no queue and no live data. They are not live traffic, not congestion and not a forecast.
- At the speed limit. Real traffic moves slower at lights, junctions and in the peak, so more vehicles are on a road at once than these dots show. 12 sections with no limit in OpenStreetMap nearby were given 60 km/h.
- Counted roads only. DIT counts state roads, mostly arterials and freeways; local streets, many council roads and the city’s smaller streets have no count here and carry no dots.
- Estimates of different ages. The counts are DIT’s estimates for July 2025 to June 2026, each from a count taken in a base year: 1,229 sections counted from 2022 to 2026, 134 earlier.
- Both directions in one count. A section’s count is both ways together; the dots split it in half each way, which is not true of every road at every hour.
- Timetable, not trains. The green dots are scheduled trips on one Wednesday, spread evenly over the day.
Sources and licences
Counts: Traffic Volume Estimates, Department for Infrastructure and Transport, South Australia (Data.SA), snapshot of estimates for July 2025 to June 2026, CC BY 4.0. Speed limits and road names: © OpenStreetMap contributors, ODbL 1.0 (extract of 13 November 2026; share-alike: the speed column is derived from it). Timetable: Adelaide Metro General Transit Feed, Department for Infrastructure and Transport, version 1721, CC BY 4.0.
Map pictures and video in Plotlay on its Ink streets base map, © OpenStreetMap contributors (ODbL), tiles Protomaps. This is independent work using open data, not endorsed by the Department for Infrastructure and Transport or Adelaide Metro.
Put your own lines in motion
Plotlay is free to start: every tool, three cloud projects.
Create free accountThen Data, a layer of lines, Style, Flow along lines